UPLOADER ЗРВ-150 "KOZAK"

PURPOSE
Scraper unloaders of the railway
wagons of "HOPPER" type are used for unloading of the bulk materials,
grain, legumes and oil crops from hopper wagons in:
- road
transport
- sea transport
Unloading and reloading of grain from
freight vehicles into railway wagons, mechanical tilling, shoveling of grain in
open and closed grain silos. The grain unloader is intended for operational (without creation
of capital reception systems) unloading of hopper wagons, provided there is
flat, hard surface under the wagon. Bulk materials are unloaded directly into a dump truck or
grain truck, and in case of further transportation over long distances - on the
conveyors.
MAIN
ADVANTAGES
- the grain unloader consists of a
pallet located horizontally, in which there are two scraper conveyors
installed, which rotate in one direction, and one vertical chain scraper
conveyor, which picks up the bulk material, supplied by the horizontal
conveyors, in turn it feeds bulk material into the trimmer
- the scraper mechanism minimizes grain
injury, which makes the overloading process more qualitative
- the frame of the grain unloader has
wheels, which makes the unloader more mobile
- hydraulic cylinders are installed on
the grain unloader, which allow to adjust the height of the unit relative to
the surface of the earth, as well as to adjust it for placement under the wagon
- the discharge box of the trimmer with
the trimmer can be turned 90 degrees in both directions, which allows to load
grain trucks in hard-to-reach places
- POSSIBILITY OF MANUFACTURING A GRAIN UNLOADER WITH A SCREW MECHANISM OF THE RECEIVING TRAY, WHICH MAKES THE GRAIN UNLOADER MORE VERSATILE FOR UNLOADING OF ALMOST ALL TYPES OF WAGONS THAT HAVE A BOTTOM UNLOADING SYSTEM ***
FEATURES
- reinforced frame made of the profile
pipe
- easy-to-manage reinforced rear gear
makes turning and maneuverability easier
- ease of lowering and raising the grain
unloader due to the high-quality hydraulic system
- there are the highest quality bearings
installed there is lighting installed for working in the dark
- using high-quality European paint and
varnish coating
- another discharge box with an adjustable tip is included in the kit, which significantly increases the capabilities of the grain unloader when unloading-overloading of the bulk materials and makes it a universal and indispensable assistant.
- The production time of the unit,
subject to the absence of finished products in the manufacturer's warehouse, is
10-20 working days (depending on seasonality).
- All our equipment is subject to state
compensation!
- The warranty period of operation is
declared by the manufacturer - 12 months from the date of transfer of equipment
by the manufacturer to the buyer, subject to the signing of all necessary
documents.
- Delivery terms: pickup from the
manufacturer's warehouse.
- Terms of payment: 50% prepayment of
the total cost of equipment subject to pre-order for the manufacture of
equipment and the remaining 50% on the day of shipment of goods from the
manufacturer's warehouse.
Technical
Delivery terms: pickup from the manufacturer's warehouse
